2.4 Test Plan: Difference between revisions
From MoodleDocs
Tim Barker (talk | contribs) No edit summary |
Tim Barker (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
=General Aim= | =General Aim= | ||
The general aim of testing applied to Moodle 2.4 is to provide early feedback and critique to developers about the system under test. This in turn will hopefully mitigate the bulk of issues earlier in the release cycle than Moodle QA. It may also increase flexibility and mitigate the risk posed by changing requirements; allowing requirements to change if necessary with the minimum of impact on the delivery of the project. | |||
=Testing Applied to the Roadmap= | =Testing Applied to the Roadmap= | ||
Suitable testing methods will be applied to the tracker issues to be tested. | |||
=Test Tools= | =Test Tools= |
Revision as of 05:38, 9 July 2012
General Aim
The general aim of testing applied to Moodle 2.4 is to provide early feedback and critique to developers about the system under test. This in turn will hopefully mitigate the bulk of issues earlier in the release cycle than Moodle QA. It may also increase flexibility and mitigate the risk posed by changing requirements; allowing requirements to change if necessary with the minimum of impact on the delivery of the project.
Testing Applied to the Roadmap
Suitable testing methods will be applied to the tracker issues to be tested.